NOVAS Technology Co., Ltd

Water and waste water project VinaCapital Danang, Veolia Vietnam

Novas has signed the contract with Veolia Water Solutions and Technologies Vietnam LLC for installation, programming, test, commission and handover all electrical and control system for Water and waste water project. The capacity of drinking water is 2.200 cubic meter and waste water is 3.000 cubic meter.

Read more...

Lam Son Sao Vang water supply project, Veolia Vietnam

Novas has signed the contract with Veolia Water Solutions and Technologies Vietnam LLC for supply, installation, programming, test and commission all electrical and control system for Lam Son - Sao Vang water supply project. The project was implemented in 08 months from June, 2015 at Lam Son district, Thanh Hoa province.

Read more...

Control system for 08 buffers Prime Company – SCG Thailand

Novas has signed a contract with the Dai Loc Prime Factory for the supply, installation, programming and handover the electrical and control system for 8 sets of buffer.

Read more...

Design ITS for Bus Rapid Transit System (BRTS) of Danang city

Consulting services for preparation of detailed designs, bidding documents, supervision of equipment system  and technical assistance for Intelligent Transportation System (ITS)

Read more...

Improvement of urban transport of Danang city funded by JICA

Pilot project: "Le Duan Traffic Corridor Management" with the idea of ​​building a pilot model to improve congestion at major intersections on this road.

Read more...

Thermal soil remediation project at Danang Airport, Vietnam

The objective of the project is remediation of a soil pollution at Da Nang Airport caused by the use of agent orange during the Vietnam War.

Read more...

Upgrading control system for boiler COB H-1503 Binh Son Refining and Petrochemical Company (BSR)

The Boiler COB-1503 system, with a capacity of 190 tonnes/hour, supply steam for the entire operation of the BSR plant, the control system used equipment of Rockwell Automation and running without redundancy.

Read more...

Da Nang watse water pumping project

Aim at building a green and clean city, Danang has wanted to build a center of water pumping to gather all waste water to a single center.

Read more...

Thuan Phuoc pumping station to reduce flood

Thuan Phuoc pumping station with capacity of 2,500KVA from total of five big pumps, all connected to the central supervisory control and data acquisition room at Danang Center of Water Relinquishment and Processing.

Read more...

Cil improvement project

In order to increase gold retrieval rate, Ball Mill Canada company decided to improve Carbon In Leach station.

Read more...

"The NOVAS's youth tries to give pleasures to its customers based on listening, thinking and doing well with the highest passion."

Partner