Client: Aquaone
Location: Trung Mau ward, Gia Lam district, Hanoi city
Main contractor: Strabag AG (Austria)
EICA subcontractor: Novas
Main data:
Production capacity: 150,000m3/day night
Number of I/O: 2,500 I/Os
Novas' scope of work:
- Design, program, supply and install all the EICA works for the whole plant
- Configure, calibrate all the electrical, control and instrumental equipment
- Commissioning & operation training
Technical features:
- Hardware and software of Schneider Electric are used
- PLCs: Modicon M580
- SCADA: Vịjeo Citect
- SCADA system comprises of 01 server and 02 Clients, 04 large LED screens
- Fiber optic cable ring to connect PLCs, RIO and Scada
- Remote monitoring of operational parameters via Internet
Project time: 2019