Upgrading the single PLCs of COB H1503 boiler to redundancy

Client: Binh Son Refinery Co., Ltd

Location: Binh Son district, Quang Ngai province

Novas' scope of work:

  • Consult, design, program, supply the hardware and software to upgrade the PLCs of the boiler from single to redundant operation mode
  • Synchronize the monitoring and control data from MVI56E-MCM Modbus modules to DCS system

Technical features: Technical solution of Rockwell Automation is used with PLCs 1756-L62 and redundant 1756-RM2

Project time: 2014

Total access: 163.489

Address: 120 Xo Viet Nghe Tinh, Danang | Phone number: +84 236 3736909 | Fax: | Email: [email protected]
© 2024 by NOVAS